A high load factor indicates that load is using the electric system more efficiently whereas consumers or generators that underutilize the electric distribution will have a low load factor.
Load factor energy calculation.
The load factor corresponds to the ratios between your actual energy consumption kwh and the maximum power recorded demand for that period of time.
Peak demand over that specific time period.
In other words the load factor is the ratio of total energy kwh used over a specific period of time to the total possible energy available within that period i e.
Divide the kwh of energy use for the month by the result to get the load factor.
It is the ratio of actual kilowatt hours used in a given period divided by the total possible kilowatt hours that could have been used in the same period at the peak kw level established by the customer during the billing period.
3000 kwh divided by 720 hours 4 16 demand limit if at 100 load factor if a 60 load factor is desired take the 4 16 100 load factor and divide by 60.
Increasing your load factor will diminish the average unit cost demand and energy of the kwh.
The load factor is.
4 16 divided by 60 7kw if the kw peak is known and the kwh is known load factor can be found by mul plying the kw by total hours and dividing the actual kwh s into that number.
Calculate the hours for each month by taking the number of days and multiplying by 24.
Depending on your situation improving your load factor could mean substantial savings.
We ll assume that 15 or 600 kwh s were used on peak with a demand of 8kw.
To calculate the on peak load factor simply take the energy used during the on peak times and use the load factor calculation.
Load factor is defined as the ratio of the average load over a given period to the maximum demand peak load occurring in that period in other words the load factor is the ratio of energy consumed in a given period of the times of hours to the peak load which has occurred during that particular period.
In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period.
It is the ratio of total energy kwh used in the billing period divided by the possible total energy used within the period if used at the peak demand kw during the entire period.
It is a measure of the utilization rate or efficiency of electrical energy usage.
Load factor in essence means efficiency.
What is load factor.
In electrical engineering the load factor is defined as a ratio of the average load divided by the maximum or peak load in a given time of period.
Multiply the number of hours in each month by the peak demand for the month.
The load factor can be calculated by using the following load factor formula.
Multiply by 100 to get the load factor expressed in percent.